Concrete overlays can be applied to patios, pool areas, driveways, sidewalks and paths, stairs, stoops and entryways – almost anywhere an existing concrete surface exists.
The Process:
• Your existing concrete is first repaired if needed, abraided and thoroughly cleaned. A layer of product is troweled on.
• After the troweled layer is dry, the desired pattern is put down with a special stranded tape, and the top coat is applied using various methods, depending upon the desired look.
• Once the design is complete the surface is sealed with a durable clear coat that protects from abrasion and UV exposure. Applications need to be re-sealed every 5-7 years to keep the surface looking new.
• Most applications take 2-3 days to complete, can be walked upon in 8-12 hours drying time, and are usable in a normal fashion in approximately 7 days, depending on daytime temperatures.